Skip to content
LinkEdu
The Campuses

A lean infrastructure deployment strategy

One active capital development site, one verified operational traction site — a realistic timeline run as an institutional roadmap.

Block foundation walls laid out across the Katanga build site, with workers running a string line and the village beyond
Capital development

Katanga Campus

Our permanent-structure build site. Completed foundations are in place, with architectural blueprints, solar off-grid infrastructure, and the LinkEdu Innovation Lab planned into the phased construction sequence.

A full classroom of pupils in pink and blue uniform seated at benches
Fully operational

Maraban Gwanda Campus

Our verified traction site, running daily instruction with urban educators transported in from Zaria and sustained by the disciplined micro-fee framework that funds local operations.

The transit model

Linking urban instructional talent to remote terrain

Step 01

Recruit in Zaria

Qualified urban educators are hired against the same standards used in city schools.

Step 02

Transport daily

A daily transit run carries teachers into both rural campuses and back, removing the relocation barrier that keeps villages unstaffed.

Step 03

Sustain locally

Micro-fees collected on site cover operations, while grant capital funds permanent structures and new village clusters.

Project Portfolio

Field evidence, blueprints, and milestones

Open verified Drive directory
Pupils dressed as doctors and nurses lined up on Career Day
Career Day
Pupils in white robes performing a Cultural Day procession on a red mat
Cultural Day
Pupils in reflective vests with two staff members at the Nigerian College of Aviation Technology gate in Zaria
NCAT excursion
Completed block foundation courses marking out classrooms at the Katanga build site
Foundation build